Alcadon Group AB (publ) kommer att offentliggöra utfallet för det fjärde kvartalet 2025 torsdagen den 19 februari 2026, klockan 08.00 (CET). Samma dag, mellan kl. 15.00 – [...]
Marva Parken in Middelkerke, Belgium, needed to renew utility infrastructure across three coastal camping sites without relocating mobile homes. Alcadon and APK provided a fast-installation [...]
A large data center in Oslo required managed PDUs with a four-week delivery time to monitor power consumption and ensure flexible installation across various server racks. Alcadon and Powertek [...]
A global offshore wind farm manufacturer required protective packaging for components stored on a platform for up to 24 months before installation. Alcadon designed durable fiberglass crates [...]
Poul Sejr Nielsen A/S required expert guidance and high-quality equipment for a nursing home project in Egedal Municipality. Alcadon provided network consulting, assisting with bidding, design, [...]
A public IT organization in Denmark required optimized racks and PDUs for its data center expansion. Alcadon and Enoc developed a tailored solution, including 1,240 mm deep racks with enhanced [...]
A global wind energy company required standardized fiber solutions to improve installation efficiency and reduce variations between wind farms. Alcadon collaborated to develop pre-configured wall [...]
An installer company required pre-assembled ODFs to standardize installations and reduce on-site assembly time. Alcadon worked closely with the customer to define specifications, confirm pricing, [...]
A major energy company required standardized, pre-assembled BUDI boxes to reduce installation errors and speed up deployment. Alcadon worked with CommScope and the customer to define, test, and [...]
Mercury, an engineering firm in Ireland, needed a faster and more reliable labeling solution for network infrastructure. Their previous vendor caused delays and inconsistent results. By [...]